Location: Koper, Slovenia
Designing period: 2020-2022
Investor: Municipality of Koper
Load-bearing structure: RC foundations, steel structures, deep foundation on piles
Service performed: Construction Plan in the Design for Building Permit (DGD) and Design for Execution (PZI) project stages
Engineering methodology used: BIM with Autodesk Revit